U3O8$...0.00%|CCJ$...0.00%|OKLO$...0.00%|CEG$...0.00%|URA$...0.00%|URNM$...0.00%|NXE$...0.00%|U3O8$...0.00%|CCJ$...0.00%|OKLO$...0.00%|CEG$...0.00%|URA$...0.00%|URNM$...0.00%|NXE$...0.00%|
SECOND ATOMIC AGE
reactorsSHUTDOWN_PERMANENT

FiR 1 (TRIGA)

Located at the VTT Technical Research Centre in Otaniemi, Espoo, Finland, FiR 1 is a 250 kWth TRIGA Mark II research reactor. It was used for civilian purposes such as neutron activation and boron neutron capture therapy (BNCT) before its permanent shutdown in 2015. The reactor no longer operates bu

Key Stats

CountryFinland
StatusSHUTDOWN_PERMANENT
Sources1
Tags3
UpdatedMay 10, 2026
Data QualityHigh Quality

100/100

FiR 1 (TRIGA)

Status: SHUTDOWN_PERMANENT Category: RESEARCH Country: Finland Finland Operator: vtt-technical-research-centre Type: TRIGA TRIGA Capacity: 0.25 MWth (thermal only)

Overview

Located at the VTT Technical Research Centre in Otaniemi, Espoo, Finland, FiR 1 is a 250 kWth TRIGA Mark II research reactor. It was used for civilian purposes such as neutron activation and boron neutron capture therapy (BNCT) before its permanent shutdown in 2015. The reactor no longer operates but contributed to Finland's nuclear research legacy.

Key Facts

Notes

VTT Otaniemi, Espoo. 250 kWth TRIGA Mark II. Permanently shut down 2015.


Source: IAEA PRIS / reactors_canonical · Enriched by Grok Last updated: 2026-05-10

Sources

Sources (1)

Related Notes

Tags:reactorsshutdown_permanenttriga